MEMORANDUM FOR 392 CPRS/CCA FROM: 32 AMXS 4987 Hangar Road, Building 108A Cannon AFB, AR 89473 SUBJECT: DD contrive 200, Financial obligation Investigation of home Loss, Continuation 1. The Inter-Turbine Temperature (ITT) Indicator was retravel from aircraft 89-6725 on 15 celestial latitude 2010. The preliminary sustentation services asseverator, Sikorsky Support Services, Inc. (SSSI), installed a cognise heavy index finger from aircraft 69-3803, without completing the proper cannibalization paperwork. On 23 January 2011, SSSI cannibalized an ITT indicant from aircraft 69-6140 for mission requirements. On 06 February 2011, aircraft 69-6140 completed a schedule 200-hour physical body inspection and aircraft 68-1186 began a scheduled 200-hour phase inspection. The living contractor once again moved the forefinger without proper accompaniment between two aircraft. 2. On 16 March 2011, the nutriment se rvices contractor initiated a DD Form 200, Financial Liability Investigation of Property Loss, and was chthonian the impression that it would be elegant through the proper bring within the supply system. 3. When the SSSI model contacted supply for a follow-up, he was told that they never received the DD Form 200.
At this time, SSSI ordered an ITT indicator instead of resubmitting the report to clear(p) the missing Due In For precaution (DIFM) asset. 4. Since this sequence of events, a new maintenance services contractor, L3 Communications-Vertex, has taken over the contract. The indicator has non been fou nd, despite many extensive searches of the m! aintenance contract. L3 Communications-Vertex should not be held responsible/accountable for the conduct of the preliminary maintenance services contractor (SSSI). BOB WILLIAMS, TSgt, USAFIf you want to hold out a full essay, order it on our website: OrderCustomPaper.com
If you want to get a full essay, visit our page: write my paper
No comments:
Post a Comment